Waters Network Systems GS1016 Specifikace Strana 7

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 10
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 6
2
¾ Plastic case, desktop or wall-mounting design
¾ External Power Adapter supply
Chapter 2. Installation
2.1 Mounting the Switch on a Desk
To install the Switch, please follow the steps:
1) You can place the Switch on a flat desk.
2) Please inspect the Power Adapter carefully and make sure that it is properly connected to a
power source.
3) Ensure adequate ventilation space around the switch for dissipating heat and air.
) Note:
Please avoid any heavy thing placed on the switch.
2.2 Power On
Powering on the Switch, it will automatically initialize and its LED indicators will respond as
follows:
1) All of the Link/Act LED indicators will flash momentarily, which represents a resetting of the
system.
2) The Power LED indicator will light all the time.
) Note:
If the LED indicators don’t respond as described above, please check the power supply and its
connection.
Zobrazit stránku 6
1 2 3 4 5 6 7 8 9 10

Komentáře k této Příručce

Žádné komentáře